Solving the AI Data Center Power Crisis

Traditional power infrastructure cannot keep pace with AI and hyperscale computing demands. GridFree AI delivers a better way.

How GridFree AI Solves It

Power Foundry™ addresses every major challenge with proven technology and innovative integration.

Speed to Market

24-Month Deployment

Our modular Power Foundry™ uses proven, off-the-shelf components that can be deployed in 24 months - not 5-7 years. This means your data center can be operational years ahead of traditional grid connections.

  • Standardized components eliminate custom engineering
  • Modular construction reduces cost and schedule risk
  • Deep OEM relationships deliver advantaged sourcing of key long lead items
  • Simplified permitting with proven technology stack
24
Months
vs. 5-7 years traditional
5 GW
Scale
Gigawatt-scale deployment
Grid Independence

On-Site Power Generation

Power Foundry™ generates power on-site, eliminating dependence on constrained grid infrastructure. Deploy data centers anywhere with fuel access, not just where the grid has capacity.

  • No grid interconnection delays or capacity limits
  • Instead of taking power from the grid, the Power Foundry™ can support the grid in times of demand stress
  • Two separate, independent sources of natural gas with firm transportation contracts ensure continuous power operations
Reliability

99.999% Uptime

Redundancy across all systems - turbines, BESS, cooling, and distribution - ensures continuous operation even during maintenance or component failure. No dependence on aging grid infrastructure.

  • Multiple redundant turbines and battery systems
  • Instant failover with integrated BESS
  • Independent from grid outages and power quality issues
99.999%
Uptime
5x9 reliability standard
80%+
Efficiency
Combined heat and power
Cost Efficiency

Lower Total Cost

Trigeneration captures waste heat for cooling, achieving 80%+ efficiency. Combined with avoided grid interconnection costs, Power Foundry™ delivers lower total cost of ownership.

  • No grid interconnection fees (save $100M+)
  • Waste heat recovery reduces cooling costs
  • Predictable energy costs independent of grid rates

1 Gigawatt Data Center Campus

Watch how our integrated trigeneration and BESS system delivers reliable, scalable power for data centers.

The Challenge

Traditional power infrastructure cannot meet modern data center demands.

Long Lead Times

Traditional grid connections take 5-7 years—too slow for AI infrastructure needs.

Grid Constraints

Many regions lack capacity for gigawatt-scale data centers, limiting growth.

High Costs

Grid upgrades and interconnection fees add hundreds of millions in expenses.

Reliability Risks

Aging grid infrastructure exposes centers to outages and power quality issues.

Limited Scalability

Traditional solutions struggle beyond hundreds of megawatts, constraining AI training.

Regulatory Complexity

Utility regulations and permitting processes add years of delays and uncertainty.

Ready to Solve Your Power Challenge?

Let's discuss how Power Foundry™ can deliver the power and cooling your data center needs.